Concrete around a post
(hole area − post area) × depth × countHole area is π × radius². Lumber presets subtract the actual rectangular post area; round and custom sizes use the entered outside diameter.
Estimate the concrete that fills a cylindrical hole after subtracting the space occupied by each post.
The post volume is subtracted from each cylindrical hole.
(hole area − post area) × depth × countHole area is π × radius². Lumber presets subtract the actual rectangular post area; round and custom sizes use the entered outside diameter.
Cross-sectionπ × 0.50² − (3.5 ÷ 12)² = 0.700 ft²
Measured0.700 × 3 × 8 = 16.81 ft³
With 10% waste16.81 × 1.10 = 18.49 ft³
80 lb bags18.49 ÷ 0.60 = 30.81, rounded up to 31
| Concrete depth | Concrete volume | 80 lb bags at 0.60 ft³ |
|---|---|---|
| 2 ft | 1.40 ft³ | 3 bags |
| 3 ft | 2.10 ft³ | 4 bags |
| 4 ft | 2.80 ft³ | 5 bags |
This table is a material comparison, not a recommendation for hole diameter or embedment. Add an allowance for irregular excavation and verify the bag's stated yield.
Post embedment, hole size, drainage, uplift resistance, frost depth, bracing, concrete type, and cure time depend on the structure and site. Follow product instructions, approved plans, and local requirements.